Aluminium Fencing Brisbane

Fencing Guide

Fencing on or Near an Easement in Queensland: What You Can Build and Who Approves It

Found a shaded strip on your survey plan? An easement rarely stops you fencing your block: but it does decide who you ask first. Here is how a fence on an easement works in Queensland, in plain English for SEQ homeowners.

9 minute readPublished 3 August 2026Updated 19 August 2026

Discovering an easement on your title is usually a surprise: a shaded strip on the survey plan and a document full of legal wording. The good news is that an easement rarely stops you fencing your block: it just changes the order you do things in. Here is who approves a fence on an easement, what the major SEQ easement holders actually allow, and how to build a fence you will not regret if the diggers ever arrive.

The quick answer

  • You can usually run a fence along or across an easement, but the registered easement conditions rule: most holders want to see or approve your plans first.

  • Council drainage easements: no structures inside the easement area, though boundary fencing across the flow path is generally accepted if water can still pass.

  • Urban Utilities (water and sewer) and Energex (electricity) both require consent before works on or over their easements.

  • If services need access, the fence may have to come out (usually at the owner’s cost) so build it removable.

What is an easement, and why is it on your title?

An easement is a registered right for someone who is not the owner to use part of your land for a defined purpose. In South East Queensland the common ones are stormwater drainage easements in favour of your council, sewer and water easements in favour of the local water authority, electricity easements in favour of Energex, and access easements shared with a neighbouring block. The easement sits on your title and binds every future owner: you still own the land and can enjoy it, but you cannot do anything that defeats the easement’s purpose or blocks the holder’s access.

To see exactly what yours allows, order a copy of the title and the registered easement document from Titles Queensland. Conditions vary between documents, so read your own rather than relying on a neighbour’s experience. One quirk worth knowing: a drainage easement does not always mean a pipe is there today: it can simply reserve the right to install one later.

Can you build a fence on an easement in Queensland?

Usually, yes. A fence is one of the few structures most easement holders will tolerate: it is light, shallow-footed and easy to remove compared with a shed or slab. But three layers of rules apply:

  • Normal fence rules still apply. A fence up to 2 m generally needs no building approval in Queensland, and 1.8 m is the usual full-height dividing fence: our Queensland fence height guide covers the details.

  • The easement conditions apply on top. The registered document may prohibit structures in the easement area outright, or allow them only with the holder’s approval.

  • The holder’s consent is the gate. Councils and utilities each have their own process, and most want it done before a post hole is dug: not after.

Council drainage easements are the ones SEQ homeowners meet most often, and the guidance is refreshingly practical. Logan City Council, for example, says you must not build structures in a drainage easement area, but you can put fencing across the drainage flow path at the property boundaries: provided the fence does not stop the flow of water. The catch: the fencing, and any damage floodwater does to it, is entirely the owner’s responsibility.

Who approves a fence on or near an easement?

It depends entirely on who holds the easement: the title search tells you. At a glance:

Easement typeWho to askTypical position on fences
Stormwater drainageYour councilNo structures in the easement area; boundary fencing across the flow path generally accepted if water can pass
Sewer or waterUrban Utilities (Brisbane, Ipswich and surrounds) or your council’s water businessConsent required before any works encroach on or over the easement; clearances also apply near pipes
ElectricityEnergexWritten consent before works in the easement; some works ruled out for electrical safety
Access (shared driveway, battleaxe block)The neighbour who benefitsMust not block their right of way; fences and gates across it need their agreement

A general guide only: the registered easement document for your lot always takes precedence.

For sewer and water easements, Urban Utilities is explicit: building or construction works encroaching on or over a registered easement need consent from the easement owner before any works are undertaken. Clearances also apply near the pipes themselves under the Queensland Development Code MP 1.4: for a house-scale structure, roughly 3 m horizontally from the centreline of the sewer or water main before approval is triggered. For electricity easements, Energex requires its written consent before you carry out works in the easement, and rules some works out entirely for electrical safety reasons.

What happens if services need access?

The blunt version: the easement holder wins. Councils and utilities can enter the easement to inspect, maintain or replace their infrastructure: that is the whole point, and your permission is not required. If your fence is in the way it can be required to move, and under most easement conditions the cost of removal and reinstatement sits with the owner, not the authority. Logan council goes further still: if an owner does not comply with easement conditions, it can rectify the problem itself and charge the cost back through the rates account.

None of that means you should leave the strip unfenced. It means you should fence it like someone might dig it up one day:

  • Keep posts and footings out of the easement strip where the layout allows: concrete footings are what really annoy excavator operators.

  • Put a gate or removable panel where the easement crosses the fence line, especially over manholes and inspection points.

  • Choose a fence that unbolts. Panels that bolt to posts can be lifted out and reinstated in minutes; a continuous rail-built run cannot.

  • Lodge a free Before You Dig Australia enquiry before digging any post holes near underground services: it maps what is actually below.

One related trap: drainage easements tend to follow the low side of a block, which is exactly where fences meet retaining walls. That combination has its own height and approval rules: our guide to fences on retaining walls in QLD walks through them.

Easements and dividing fences: who pays?

An easement along the boundary does not switch off the normal dividing fence rules. Under the Neighbourhood Disputes (Dividing Fences and Trees) Act 2011, adjoining owners still share the cost of a sufficient dividing fence on the common boundary: and the easement holder is not a neighbour, so the council or utility does not chip in. If your neighbour is dragging their feet, the Act’s formal process still applies; our guide to the QLD notice to contribute explains how to use it.

One wrinkle: if the easement conditions force a particular design (say, an open style so overland flow can pass, or a gate at an access point) that requirement becomes part of what a “sufficient” fence looks like in that location. Agree on it with your neighbour up front so the quotes you swap are for the same fence.

An aluminium fence that suits an easement

Powder-coated aluminium is well matched to easement fencing. FY panels are made to order and bolt to the posts rather than being built as one continuous run, so the panel over the easement can be unbolted, set aside during works and reinstated without touching the rest of the fence. A matching gate over the access point keeps the utility happy and your yard secure, and open blade or picket styles let stormwater pass where a drainage path crosses the boundary.

We supply panels, gates and hardware DIY-ready across South East Queensland: Brisbane, Logan, Ipswich, Gold Coast, Sunshine Coast and Toowoomba (see our service areas): or we can arrange professional installation. Browse the online shop, or send us your survey plan and we will help you lay out panels, posts and gates around the easement.

Frequently asked questions

Can you build a fence on an easement in Queensland?

In most cases yes, subject to the registered easement conditions and the easement holder’s consent. Councils commonly accept boundary fencing across a drainage easement if water can still flow, while Urban Utilities and Energex require consent before works on or over their easements. Always check your specific easement document first.

Who approves a fence on an easement?

The easement holder named on your title: your council for stormwater drainage, Urban Utilities or your council’s water business for sewer and water, Energex for electricity, and the benefiting neighbour for an access easement. A title search through Titles Queensland shows who holds it and on what conditions.

Can the council or a utility make me remove my fence from an easement?

Yes. Easement holders can access their infrastructure for maintenance and repair, and a fence in the way can be required to move: with removal and reinstatement usually at the owner’s cost. Some councils can even fix a non-compliant easement themselves and charge the cost to your rates. Removable bolt-together panels take most of the sting out of this.

Does my neighbour still have to pay half for a dividing fence on an easement?

Generally yes. The Neighbourhood Disputes (Dividing Fences and Trees) Act 2011 cost-sharing rules apply to the common boundary regardless of an easement, and the easement holder does not contribute. If the easement dictates the design, agree on that design with your neighbour before exchanging quotes.

How do I find out if my property has an easement?

Order a title search and a copy of the survey plan from Titles Queensland: easements appear on both, and the registered easement document sets out the conditions. If you bought recently, your contract disclosure and conveyancing file should also list any registered easements.

This article is general information only, not legal advice. Easement conditions are specific to each registered document and each easement holder’s requirements can change. Confirm your situation with your council, the relevant utility, or a property lawyer before you build.

Working out what your fence line needs? Tell us the run and the height and we will quote it, supply-only or installed.

  • Brisbane-based supplier
  • Aluminium fencing & gates
  • Supply or installed

Fencing a block with an easement?

Send us your survey plan for a supply-only or supply-and-install quote: removable panels and gates laid out around the easement, delivered across South East Queensland.

(07) 3803 1098Get a free quote